
Overton Park Elementary School
Overton Park Elementary School
A new elementary school to address overcrowding at the existing Tanglewood Elementary campus.



Fort Worth, Texas 76109

EMAIL UPDATES
Subscribe below to receive Overton Park Elementary School email updates.

10/29/2021
Procedeo aims to help students achieve their academic goals in inspirational and inviting spaces. As part of the FWISD 2017 […]


12/10/2020


12/10/2020


12/10/2020


10/02/2020
Take a look at the new Overton Park entrance!


09/18/2020
Take a look at some of the finishing touches of Overton Park!


09/04/2020
The playfields are nearly complete, and the project is wrapping up!


08/21/2020
The “Pocket Park” turf has been installed and the multipurpose room screen install has begun


08/07/2020
All of the concrete in the back field of the school is complete and the lower grade playground is currently […]


07/24/2020
The kitchen equipment and serving line have been installed, and the flooring in the cafeteria is complete.


07/17/2020
The library furniture install is complete!


07/15/2020
The front entry ramp is ready for its concrete pour and the front sidewalk is being prepped for the flatwork.


07/10/2020
The proscenium flooring is being installed, the library shelves are being set up, and some of the classroom furniture has […]


07/03/2020
The front retaining wall form and footers have been prepped and are ready for concrete


06/26/2020
Site improvements are ongoing at Overton Park and starting to take shape. The south entry concrete sidewalk has been poured, […]


06/18/2020
The front retaining wall concrete pour was completed and we are installing the interior stone for the main entry hallway


06/12/2020
Installations seem to be occurring all over Overton Park! The kitchen equipment is being installed, the work on the hallway […]


06/03/2020
Rebar for the new fire lane has been set and is ready for the concrete pour this week. The trench […]


05/29/2020
The east fire lane has been formed and is ready for rebar! Meanwhile, the retaining wall footer rebar is being […]


05/22/2020
The sidewalks have been cut and are ready to begin grading, and the library ceiling paint is complete!


05/15/2020
The two-story classroom wing has millwork installed and markerboards on the walls, and lights in the ceiling grid. The geothermal […]


05/01/2020
Steele & Freeman has finished painting and started installing millwork and marker boards in the two- story classroom wing. Paint […]


04/20/2020
Installations are here, there, and everywhere around Overton Park. The exterior finishes of the building are being installed, the front […]


04/13/2020
Across the courtyard, the masonry install at the preschool & kindergarten wing is being installed, and the installation of the […]


04/03/2020
Progress is being made all over Overton Park! The exterior of the building is moving along with the brick and […]


03/20/2020
We want to give another huge thank you to our partner Steele & Freeman. They have been making incredible progress […]


03/06/2020
Windows have been installed along the front face of the school which will bring lots of natural daylighting into the […]

02/27/2020
Students will enjoy lots of natural daylighting and views to the outdoors in their new cafeteria. Did you know that […]

02/24/2020
Steele & Freeman have been working through the weather the last few weeks and making great progress on the building. […]

02/19/2020
We’re working on the detail of the iron work for the second-floor library!

02/17/2020
Check out the hallway view of the metal framing, the above ceiling mechanical, electrical, and plumbing rough, and the in-wall […]

02/13/2020
It seems everyone is on site these days! Steel Freeman is finishing up the last wing of the steel installation, […]


01/29/2020
Steele Freeman has been pushing hard these last few weeks throughout all of our weather. We are so excited to […]


01/22/2020
Big things are happening over here at Overton Park! For the interior, we’ve been working on the mechanical ductwork and […]


01/21/2020
The building is taking shape! We have been working on the interior metal stud framing (photo 1), the setting steel […]


01/13/2020
The sun rises, and the concrete sets! Right now it may just look like slabs of concrete; but this will […]


12/23/2019
Overton Park is moving upwards! The second story steel is being worked on by Steel Freeman, and we are preparing […]


11/20/2019
This is how structures are built! Void boxes, poly and rebar, and large concrete pours. The upper grade classroom wing […]


10/31/2019
An aerial view of the site shows preparations for pouring the building pad.


10/12/2019
Concrete is being poured to continue building the foundation in preparation for the slab pour.


09/25/2019
Gradebeam forming is underway on part of the school, while Gradebeam forms are removed prior to backfill for other parts.


08/29/2019
Gradebeam framing and rebar are being set up.


08/07/2019
Aerial shots of the general contractor drilling foundation piers in the administration wing and excavating for grade beams in the […]


07/30/2019
Drill rig is currently drilling piers along the building pad. Wooden safety structures are created for the open holes being […]


07/17/2019
Site grading and excavation is taking place, with a 5’ cut out of the Northwest corner of the site.


07/01/2019
Construction is underway at Overton Park Elementary School with site work commencing.


05/01/2019
Preliminary renderings give a glimpse of what the recently named Overton Park Elementary School may look like.


12/04/2018
A pre-proposal meeting was held where vendors could find out more information about aspects of the procurement process, proposal requirements, […]

11/26/2018
A pre-proposal meeting will be held on Monday, December 3rd, at 10:00am for the bid opportunity, CMAR 19-071 New Elementary […]